Monday, 22 December 2014

Layout Progress to December 2014

Work has been slow on Eden Park Rail mainly due to health issues but some progress has been made on completing the brick wall that hides the storage tracks under the City of Eden Park.



Above - The view before the brick wall was added.



Above 2 photos show the brick wall fitted. The wall was made from layering .05 styrene sheet with Noch printed prick sheeting allowing it to be sturdy enough but still allows the wall to follow the contour of the upper deck. Note next to the Lenz DCC controller the switch panel for switching trains into the Northern end of the hidden storage there will be a similar panel at the opposite end as well.

No comments:

Post a Comment